2009 TERMINAL PORTUARIO DE CONTENEDORES BUENAVENTURA – TCBUEN (Colombia)

2009 TERMINAL PORTUARIO DE CONTENEDORES BUENAVENTURA – TCBUEN (Colombia)

Lugar: Buenaventura – Pacífico colombiano.
Año: 2009
Descripción: Pilotaje fundido en sitio con camisa perdida para terminal de contenedores, 2600 pilotes ejecutados. Proyecto realizado en el Consorcio UTP.

eeiconstruccion was selected by Sunoco Logistics Partners, LP to construct two new barge dock slips to support expanded terminal operations and storage capacity. The project is located on the Neches River in Nederland, Texas.

The project included demolition of the existing bulkhead and marine structures, construction of 900 linear feet of sheet pile bulkhead, installation of 12 arch fenders, installation of 10 new 42” and 60”diameter monopile breasting dolphins up to 130’ long, re-location of two existing drainage outfalls, and mechanical dredging of approximately 40,000 cubic yards of material consisting of virgin bank and existing river bottom to a depth of -15 feet below mean low tide (MLT).

The project began construction in May 2015 and completed in December. eeiconstruccion’s self-perform work included all site work, 1:1 battered pile, sheet piling, waler system installation, driving of monopile, fender installation, and utilities work.

Client:

Client Name

Tipo de Contrato:

Name Tipo de Contrato

Ejecución:

Name Ejecución

Administrator:

Name Administrator

Dates:

Name Administrator

Special Comments:

Name Special Comments

2013 PUERTO DRUMMOND - SANTA MARTA (Colombia)

2013 PUERTO DRUMMOND - SANTA MARTA (Colombia)

2013 CUÁDRUPLE CARDUMPER PARA CARBÓN - DRUMMOND (Colombia)

2013 CUÁDRUPLE CARDUMPER PARA CARBÓN - DRUMMOND (Colombia)

2012 TUNEL DEPRIMIDO – VÍA AL MAR - CRESPO CARTAGENA (Colombia)

2012 TUNEL DEPRIMIDO – VÍA AL MAR - CRESPO CARTAGENA (Colombia)